Tronox – Kemerton
J&P Deconstruction dismantled and removed associated plant and equipment that was identified in the site visit. To Transport plant and equipment, oxy cutting and hand tools were used to make the pieces transportable sizes. All steel work that was attached to the existing shed was cut flush with the columns and grounded up then painted with under coat. J&P Deconstruction removed all redundant plinths that had been identified in the site visit to a level of 100mm below floor level then back filled with 40mpa concrete.