The Laminex Group
Contract – Dismantle and removal of redundant Industrial Ovens
Duration – November 2021 to January 2022
J&P Deconstruction removed the Industrial oven starting from the Western end, the oven was reduced in to sections and removed with the use of a 10 tone low mast fork lift. The sections were placed outside the eastern side of the shed awaiting load out on to J&P transport.
Once the oven was removed, J&P Deconstruction removed the redundant pipe work and the electrical cabinets along the western wall. Once the western wall had been cleared, J&P Deconstruction removed the ducting from the ceiling.
J&P Deconstruction removed the clue room and attached the lean-too down to floor level as well as leave the purlins on the shed wall then moved over and remove the tanks from site.